Travel Risk Assessment Procedure (TRM)

General Data

Traveler Profile

Trip Profile

Manage Risk Sources

Step A: Destination Risk (R_destinazione)

+ Add new source
+ Add new source
+ Add new source

Step B: Core Variables (1 to 4)

Step C: Aggravated Generic Risks (R_hazard)

Step A Subtotal
(Dest Risk x 0.25)0.25
Step B Subtotal
(Core Variables Weighted)0.50
Step C Subtotal
(Aggravated Risks x 0.25)0.25

Initial Risk Score (Grand Total)

1.00

Required Mitigation: Level A

Evaluator Mitigation Framework

Space freely fillable by the technician. This box, if not modified, will remain unchanged for subsequent uses until the technician decides to modify it.

Pre-assessment & Verification

Residual Risk Calculation (Post-Mitigation)

Residual Risk Score (PxD)

1

Level 1 (Not significant) - Authorization Not Necessary

Outcome of Travel Risk Assessment

To be delivered to the traveller

Name and surnameBusiness Role
Country of dest.

Outcome of the risk assessment

Destination RiskResponse Capacity
Traveler ProfileActivity Profile
Specific HazardsInitial Risk

Required Mitigation Measures (Applied: )

Additional Notes

Residual risk (after mitigation)

R_residuo (P × D) Residual Level

Declaration for the transferee

The undersigned declares that I have received the results of the risk assessment, mandatory mitigation measures, operating instructions, emergency contacts, and attached documentation.

Signature of transferee: _____________________________ Date: ___ / ___ / ______

Incident Report

Post-Trip Evaluation